Verint NEXTIVA S2800E series Podręcznik Użytkownika Strona 22

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 21
2: Installing and Configuring the S2800e
Verint Video Intelligence Solutions 14
2. If the ceiling requires additional independent support for the S2800e, install the
optional in-ceiling mount kit (V-IC-MKT). It consists of a pre-assembled set of mounting
rails and folding ring:
a. Push the mount kit assembly up through the ceiling hole and unfold it.
b. Position the assembly squarely over the hole and fasten the caddy rail clips to the
existing frame. Remove adjacent tiles to access the clips.
c. Adjust the position of the caddy rail clips along the frame to obtain the best "X"
position.
d. Slide the assembly along the caddy rails to obtain the best concentric "Y" position.
Tighten the horizontal adjustment screws to secure the position.
e. With the ring concentric with the hole, slide the ring vertically along the support
slots to obtain the best flush fit in the ceiling. The ring should be firmly seated
against the tile without warping it.
3. Feed the flexible conduit pipe or cables down through the ceiling hole.
Nextiva S2800e Series User Guide.book Page 14 Wednesday, March 11, 2009 3:20 PM
Przeglądanie stron 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 70 71

Komentarze do niniejszej Instrukcji

Brak uwag